A PICK-N-CARRY MOBILE CRANE BOOM STRESS ANALYSIS

Authors

  • Md Nazer Ahmed
  • Dr.Zahir Hasan

DOI:

https://doi.org/10.46243/jst.2020.v5.i04.pp220-237

Keywords:

Boom, Strength

Abstract

Mobile crane telescopic booms that are light and sturdy are a rarity. Crane booms may be retracted and extended in a variety of ways. Although retraction of the crane's boom improves its performance, extending the boom reduces its operational capacity. Increasing the distance makes communication more difficult. The crane's lifting capacity decreases as it moves away from the load. It used to be that crane booms couldn't go to new heights, but that's no longer the case. When the crane's boom is fully extended and angled to the highest degree achievable This research relies on the utilisation of crane boom and component stress analysis. SAE J1078 [2] specifies that calculations must be done by hand. The crane boom may be more efficient if its weight and strength are maximised. The crane boom components are compared in this research.

References

Lawrence K. Shapiro and Jay P. Shapiro, “Cranes and Derricks” Fourth edition McGraw Hill.1980

SAE J1078 Reaffirmed APR94, “A Recommended method of analytically determining the competence of hydraulic telescopic cantilevered crane booms.”

Navneet Kumar and Mohd. Parvez, “Force distribution on telescopic boom of crane.” Int. J. Mech. Eng. & Rob. Res.2012 Vol.1, No.2, ISSN 2278-0149

Marquez, P. Venturino and J. L. Otegui, “Common root causes in recent failures of cranes.” Engineering Failure Analysis 2014; 39: 55- 64

Guangfu Sun and Micheal Kleeberger, “Complete dynamic calculation of lattice mobile crane during hoisting motion.” Mechanism and Machine theory 2005;40: 447-466

IS: 4573 1982, Edition 2.1 (1989-09) Specification for Power Driven Mobile Cranes

IS:2062(2011) Hot rolled medium and high tensile structural steel

ISO 4309 Cranes–Wire ropes Code of practice for examination and discard

ISO 4310 Cranes-Test code and procedures

AISC “Specification for structural steel buildings–Allowable stress design and Plastic design.” June1, 1989 with commentary

Richard L. Neitzel, Noah S. Seixas and Kyle K. Ren, “A review of crane safety in the construction industry”2001;16(12):1106-1117

Published

2020-07-08

How to Cite

Md Nazer Ahmed, & Dr.Zahir Hasan. (2020). A PICK-N-CARRY MOBILE CRANE BOOM STRESS ANALYSIS. Journal of Science & Technology , 5(4), 220–237. https://doi.org/10.46243/jst.2020.v5.i04.pp220-237